Lift Station and Pipeline Improvements
|
| |
This lift station and pipeline improvement project consisted of an alignmentstudy to investigate alternate routes for a proposed 15-inch sanitarysewer gravity pipeline and dual (8" and 12") parallel sanitary forcemains.
Once the study was completed and an alignment selected the actualdesign and preparation of construction documents and construction managementservices commenced. The 4,200 linear feet alignment is from a proposed3.2 mgd lift station that will be constructed at 67th Avenue and SoftwindDrive to an existing temporary lift station that will be dismantledat 61st Avenue and Charlotte Drive. The alignment followed a naturalwash for approximately one-half of the alignment length requiring a404 permit with the Army Corp of Engineers.
Supplemental work included: - Topographic survey
- Staking
- Architectural design of decorative masonry screen walls
- Preparation of colored renderings
- Mitigation of native vegetation
- Right-of-way investigation
- Coordination and meetings with the community and adjacent property owners and preparation of exhibits for the Army Corp of Engineers 404 Permit.
|
|
|
|
 |
LATEST PROJECTS
|
| |
The 35th Avenue and Peoria Avenue pipe bursting project was perform.. | | | | |
1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext.. | | | | |
500 South was approximately a two-mile roadway widening project. The existing two or three lane .. | | | | |
This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o.. | | | | |
Project Engineering Consultants (PEC) provided planning, design, and construction management for.. | | | | |
Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is .. | | | | |
PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co.. | | | | |
Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from .. | | | | |
The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat.. | | | | |
This project consisted of widening a two lane road to a five lane arterial road cross section. T.. | | | | |
|
|