Union Hills Storm Drain
|
| |
Design and survey for one mile of precast 11-foot x 11-foot concrete box culvert in Union Hills Drive from 43rd Avenue to 51st Avenue. The work element included preparation of construction plans, specifications, estimates, details, pipe sizing and hydraulics.
The plans were designed to accommodate the selection of four alternate (Alt) drain designs. - Alt #1 was a 12-foot reinforced concrete pipe;
- Alt #2 was an 11-foot x 11-foot box culvert using precast roof and walls with a cast-in-place floor;
- Alt #3 was a precast 11-foot x 11-foot box culvert;
- Alt #4 was a cast-in-place 12-foot x 11-foot concrete box culvert.
A unique feature of the project was the need to develop special details for sleeving of three separate sanitary sewer pipelines through the storm drain line.
|
|
|
|
 |
LATEST PROJECTS
|
| |
The 35th Avenue and Peoria Avenue pipe bursting project was perform.. | | | | |
1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext.. | | | | |
500 South was approximately a two-mile roadway widening project. The existing two or three lane .. | | | | |
This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o.. | | | | |
Project Engineering Consultants (PEC) provided planning, design, and construction management for.. | | | | |
Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is .. | | | | |
PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co.. | | | | |
Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from .. | | | | |
The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat.. | | | | |
This project consisted of widening a two lane road to a five lane arterial road cross section. T.. | | | | |
|
|