Cave Creek Road Water Transmission Lane

Cave Creek Water Transmission EngineeringThe first phase of this project was an aerial survey for approximately20 miles of the proposed alignment along Cave Creek Boulevard from DeerValley Road to Dove Valley Road and a portion of the future MayoBoulevard alignment to be used by PEC and seven other engineeringconsultants. 

The second phase was the design of 9,300 L.F. of 54-inchdiameter water transmission main and parallel 36-inch diameterreclaimed water main on a portion of the proposed alignment. PEC'sassignment also included coordination with other consultants,supplemental surveys and adherence to an aggressive design schedule. 

Major work elements included all necessary engineering work incidentalto:
  • field surveys
  • aerial control survey
  • cost estimates
  • supplemental specifications
  • design plans for construction
  • post design services
Butterfly valves were installed with manhole vaults, fire hydrant blowoff assemblies, and steel cylinder pipe with welded restrained jointsas required. Portions of the 20-mile proposed alignment were in anenvironmentally sensitive area requiring PEC's assistance in securingthe 404 Permit. 

Right-of-way plans were also developed for the entire20 miles. In compliance with ADWR, PEC also provided structuralcalculations and design drawings for proposed boring and jackingthrough the Cave Buttes Dam Dike No. 2. Project.


LATEST PROJECTS

Click Here for Our Expanded Projects List


35th Ave Pipe Bursting

The 35th Avenue and Peoria Avenue pipe bursting project was perform..


1300 East Construction Management

1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext..


500 South: Redwood Rd. to I-15

500 South was approximately a two-mile roadway widening project. The existing two or three lane ..


Action Target Facilities

This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o..


Bagley Industrial Park Sewer Pipelines

Project Engineering Consultants (PEC) provided planning, design, and construction management for..


BYU Wymount Housing Site Improvements

Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is ..


Eaglewood Fire Station

PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co..


Happy Valley & Amity Roundabout

Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from ..


I-15 / 24th Street Environmental Assessment

The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat..


Karcher Road Widening

This project consisted of widening a two lane road to a five lane arterial road cross section. T..