Project Engineering Consultants, Ltd

CONTACT US

FTP Login | Employee Portal

Landon Springs Bridge, ADOT

Landon Springs Engineering ProjectThis project required the bridge replacement of the Landon Springs Bridge and a drainage study along US 89A between Oak Creek Canyon and Flagstaff Highway

PEC prepared construction plans for removal and replacement of the existing bridge. A drainage study was prepared including an HEC-2 analysis to assist the ADOT - Structures Section in the preparation of a bridge selection report. 

This project was in an environmentally sensitive area. In order to maintain the pristine conditions of the natural spring, it was necessary to provide routing and control of sediment conveyance under low flow conditions to prevent contamination of the natural spring. 

This project required the preparation of:
  • alternate highway designs reflecting bridge placement vs. box culvert
  • field surveys, detour plans
  • earthwork
  • estimates
  • special provisions
  • Coordination with the Flagstaff District Engineer, ADOT - Environmental Section and the U.S. Forest Service.


LATEST PROJECTS

Click Here for Our Expanded Projects List


35th Ave Pipe Bursting

The 35th Avenue and Peoria Avenue pipe bursting project was perform..


1300 East Construction Management

1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext..


500 South: Redwood Rd. to I-15

500 South was approximately a two-mile roadway widening project. The existing two or three lane ..


Action Target Facilities

This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o..


Bagley Industrial Park Sewer Pipelines

Project Engineering Consultants (PEC) provided planning, design, and construction management for..


BYU Wymount Housing Site Improvements

Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is ..


Eaglewood Fire Station

PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co..


Happy Valley & Amity Roundabout

Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from ..


I-15 / 24th Street Environmental Assessment

The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat..


Karcher Road Widening

This project consisted of widening a two lane road to a five lane arterial road cross section. T..

Home  |  Services  |  Projects Who We Serve  |  Employment
© 2009 Project Engineering Consultants, Ltd. Site Created and Maintained by WSI Logix.