Woody Wash Bridge, ADOT
|
| |
PEC's task was to provide bridge replacement of the Woody Wash Bridgeand a drainage study along US 89A between Oak Creek Canyon and theFlagstaff Highway.
PEC prepared construction plans for removal andreplacement of the existing bridge. A drainage study was preparedincluding an HEC-2 analysis to assist the ADOT - Structures Section inthe preparation of a bridge selection report.
The scope of work alsoincluded the preparation of: - Alternate highway designs reflecting bridge placement vs. box culvert
- Detour plans
- Earthwork
- Estimates
- Special provisions
- Coordination with the Flagstaff District Engineer, ADOT - Environmental Section and the U.S. Forest Service.
- PEC additionally provided field surveys for this project.
|
|
|
|
 |
LATEST PROJECTS
|
| |
The 35th Avenue and Peoria Avenue pipe bursting project was perform.. | | | | |
1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext.. | | | | |
500 South was approximately a two-mile roadway widening project. The existing two or three lane .. | | | | |
This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o.. | | | | |
Project Engineering Consultants (PEC) provided planning, design, and construction management for.. | | | | |
Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is .. | | | | |
PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co.. | | | | |
Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from .. | | | | |
The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat.. | | | | |
This project consisted of widening a two lane road to a five lane arterial road cross section. T.. | | | | |
|
|