Recker - Thomas Road, City of Mesa
|
| |
This arterial road project was developed as part of a master plannedcommunity in Mesa, Arizona. The project included four-miles of majorarterial street designs, three-miles of secondary arterial streetdesigns and 10-miles of residential streets.
PEC established roadwayalignments and prepared roadway improvement plans for the project.Requiring public involvement, information meetings were held to solicitcommunity input. Thomas Road and Recker Road were designed undercontract to a private development company for the City of Mesa.
|
|
|
|
 |
LATEST PROJECTS
|
| |
The 35th Avenue and Peoria Avenue pipe bursting project was perform.. | | | | |
1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext.. | | | | |
500 South was approximately a two-mile roadway widening project. The existing two or three lane .. | | | | |
This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o.. | | | | |
Project Engineering Consultants (PEC) provided planning, design, and construction management for.. | | | | |
Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is .. | | | | |
PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co.. | | | | |
Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from .. | | | | |
The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat.. | | | | |
This project consisted of widening a two lane road to a five lane arterial road cross section. T.. | | | | |
|
|