Miller Motor Sports Park Administration Building
|
| |
PEC personnel provided continual inspection and full-time soil observation and testing for this project, as well as the special inspection and testing of the structural concrete, structural masonry, and structural steel erection which included bolting and welding inspection.
This 23,500 square foot, three-story structure was completed in an amazing 98 days. "Fast Track" construction is the "new" trend of the construction industry today and as out clients reach out to achieve completion through "Design Build" and "Fast Track" planning, PEC joins with our clients in partnering cooperation to bring their project to reality.
|
|
|
|
 |
LATEST PROJECTS
|
| |
The 35th Avenue and Peoria Avenue pipe bursting project was perform.. | | | | |
1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext.. | | | | |
500 South was approximately a two-mile roadway widening project. The existing two or three lane .. | | | | |
This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o.. | | | | |
Project Engineering Consultants (PEC) provided planning, design, and construction management for.. | | | | |
Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is .. | | | | |
PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co.. | | | | |
Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from .. | | | | |
The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat.. | | | | |
This project consisted of widening a two lane road to a five lane arterial road cross section. T.. | | | | |
|
|