PEC personnel provided continual inspection and full-time soil observation and testing for this project, as well as the special inspection and testing of the structural concrete, structural masonry, and structural steel erection which included bolting and welding inspection.

This 23,500 square foot, three-story structure was completed in an amazing 98 days.  "Fast Track" construction is the "new" trend of the construction industry today and as out clients reach out to achieve completion through "Design Build" and "Fast Track" planning, PEC joins with our clients in partnering cooperation to bring their project to reality. 


LATEST PROJECTS

Click Here for Our Expanded Projects List


35th Ave Pipe Bursting

The 35th Avenue and Peoria Avenue pipe bursting project was perform..


1300 East Construction Management

1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext..


500 South: Redwood Rd. to I-15

500 South was approximately a two-mile roadway widening project. The existing two or three lane ..


Action Target Facilities

This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o..


Bagley Industrial Park Sewer Pipelines

Project Engineering Consultants (PEC) provided planning, design, and construction management for..


BYU Wymount Housing Site Improvements

Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is ..


Eaglewood Fire Station

PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co..


Happy Valley & Amity Roundabout

Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from ..


I-15 / 24th Street Environmental Assessment

The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat..


Karcher Road Widening

This project consisted of widening a two lane road to a five lane arterial road cross section. T..

Home  |  Services  |  Projects Who We Serve  |  Employment
© 2009 Project Engineering Consultants, Ltd. Site Created and Maintained by WSI Logix.