BYU Wymount Housing Site Improvements
|
| |
Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is situated at the foothills on the Eastern portion of the Campus on steep terrain, creating a potential for higher runoff. PEC was retained to be the Civil Engineer, and to mitigate flooding hazards and provide solutions to meet ADA requirements for the Complex. PEC provided solutions to capture and channelize runoff away from buildings and minimizes bypass runoff. Design included approximately 1,750 linear feet of storm drainage piping, 600 linear feet of interior roadway, and ADA accessibility to 8 housing units in four buildings. Design efforts were particularly sensitive to existing landscape features, and many iterations were made to protect existing trees and playground areas. The design was approved by BYU engineering.
|
|
|
|
 |
LATEST PROJECTS
|
| |
The 35th Avenue and Peoria Avenue pipe bursting project was perform.. | | | | |
1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext.. | | | | |
500 South was approximately a two-mile roadway widening project. The existing two or three lane .. | | | | |
This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o.. | | | | |
Project Engineering Consultants (PEC) provided planning, design, and construction management for.. | | | | |
Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is .. | | | | |
PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co.. | | | | |
Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from .. | | | | |
The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat.. | | | | |
This project consisted of widening a two lane road to a five lane arterial road cross section. T.. | | | | |
|
|