Project Engineering Consultants, Ltd

CONTACT US

FTP Login | Employee Portal

35th Ave Pipe Bursting

Burst Pit in 35th Avenue

The 35th Avenue and Peoria Avenue pipe bursting project was performed for the City of Phoenix, Arizona and established a number of firsts. The static pipe bursting installation was a huge success and was the first project in the United States to accomplish a maximum drive of 448 feet using VCP. In addition the project was the first to perform a double up size pipe burst with VCP. The process reduced the construction cost, shortened the construction schedule, reduced impacts to the public, reduced carbon emissions and provided a new sewer line with increased capacity with sustainable product. Most of all this installation method saved the City $2 million over open cut construction. For additional information about this project click here.




LATEST PROJECTS

Click Here for Our Expanded Projects List


35th Ave Pipe Bursting

The 35th Avenue and Peoria Avenue pipe bursting project was perform..


1300 East Construction Management

1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext..


500 South: Redwood Rd. to I-15

500 South was approximately a two-mile roadway widening project. The existing two or three lane ..


Action Target Facilities

This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o..


Bagley Industrial Park Sewer Pipelines

Project Engineering Consultants (PEC) provided planning, design, and construction management for..


BYU Wymount Housing Site Improvements

Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is ..


Eaglewood Fire Station

PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co..


Happy Valley & Amity Roundabout

Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from ..


I-15 / 24th Street Environmental Assessment

The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat..


Karcher Road Widening

This project consisted of widening a two lane road to a five lane arterial road cross section. T..

Home  |  Services  |  Projects Who We Serve  |  Employment
© 2009 Project Engineering Consultants, Ltd. Site Created and Maintained by WSI Logix.