The 35th Avenue and Peoria Avenue pipe bursting project was perform.. | | | | |
1300 East was a major roadway reconstruction project starting from Creek Road (about 7400 S) ext.. | | | | |
500 South was approximately a two-mile roadway widening project. The existing two or three lane .. | | | | |
This 10 acres site located in Provo Utah consist of 85,000 sq. ft. warehouse with 15,000 sq. ft of o.. | | | | |
Project Engineering Consultants (PEC) provided planning, design, and construction management for.. | | | | |
Wymount Housing is a student housing complex on the Brigham Young University Campus. The Complex is .. | | | | |
PEC provided the materials testing and inspection for soils and asphalt placement, reinforced co.. | | | | |
Project Engineering Consultants, Ltd. (PEC) was responsible for all aspects of the project from .. | | | | |
The Utah Department of Transportation (UDOT) is currently investigating alternatives to alleviat.. | | | | |
This project consisted of widening a two lane road to a five lane arterial road cross section. T.. | | | | |
The Utah Department of Transportation (UDOT) is charged with constructing highways for the State.. | | | | |
PEC's performed a complete design and railroad pre-emption for two signals in Cedar City on SR-5.. | | | | |
The 7800 South Sewer Pipe Burst Project was designed to increase the sewer pipeline capacity alo.. | | | | |
PEC worked with Summit County (County) and the Utah Department of Transportation (UDOT) on this .. | | | | |
PEC personnel provided continual inspection and full-time soil observation and testing for this .. | | | | |
This project was a major reconstruction of Harrison Blvd. an.. | | | | |
PEC provided design services for this Yavapai County Flood Control District and Yavapai County, Publ.. | | | | |
PEC provided study services for the Sentinel Watershed Floodplain Delineation Study. The 150 sq... | | | | |
PEC delineated 35 river miles within the 300 sq. mi. Theba Watershed in south Maricopa County. T.. | | | | |
PEC provided the Yavapai County Flood Control District and Yavapai County, Public Works Department w.. | | | | |
The City of Phoenix has significant quantities of metal pipe storm drain facilities consisting of va.. | | | | |
Design/Build services for roadway and drainage improvements southeastof Cave Creek Road and Pinnacle.. | | | | |
The first phase of this project was an aerial survey for approximately20 miles of the proposed a.. | | | | |
PEC performed field surveys and design for the preparation of construction plans for this two and on.. | | | | |
This project required the bridge replacement of the Landon Springs Bridge and a drainage study along.. | | | | |
This arterial road project was developed as part of a master plannedcommunity in Mesa, Arizona. The .. | | | | |
PEC provided horizontal and vertical control of one (1) foot contouraerial mapping surveying ser.. | | | | |
PEC was the prime consultant for this $2 million construction project at I-10 San Simon Port of Entr.. | | | | |
Design and survey for one mile of precast 11-foot x 11-foot concrete box culvert in Union Hills Driv.. | | | | |
PEC's task was to provide bridge replacement of the Woody Wash Bridgeand a drainage study along US 8.. | | | | |
This lift station and pipeline improvement project consisted of an alignmentstudy to investigate alt.. | | | | |
PEC performed field surveys for alignment, topography, and thepreparation of construction plans and .. | | | | |
|