|
Price Freeway - Galveston to Pecos Sewer Line, City of Chandler/ADOT/HDR Engineering |
PEC provided design and survey for two miles of sanitary sewer lines between Chandler Boulevard and Frye Road. The design included two miles of 39-inch, 42-inch and 48-inch sewer lines, sewer siphon, two diversion structures and one mile of 12-inch sewer effluent force main. PEC performed field surveys, preparation of details, cost estimates, construction plans, routing determination and coordination with all utility companies for conflicts. Abandonment's were necessary for a new highway alignment. |
|
|